Skip to content

QINFENG Custom FIBC manufacturer since 2001

Dewatering FIBC

A woven bag made with geotextile fabric so water drains out while the solids stay in. It is sized from the sludge, the flow and the containment requirement rather than from a working load alone.

Direct factory B2B volume pricing
Bag size Circumference 2-9 m, height 1-2 m (typical)
Fabric Woven geotextile, selected by opening size and permeability
Filling Top fill port or open top
Lifting loops Four corner loops, reinforced
Base Closed flat base
Seams Double-row stitched
What it settles: Treats the bag as a filter rather than a container: it explains the fabric and size decisions and states plainly that discharge compliance stays with the…
Best for: Sludge, sediment and dredgings where the site needs to reduce water content before haulage or disposal and has space to drain bags in batches.
Not the answer when: The material must stay fully contained with no discharge, the site has no space for a drainage pad, or the solids are too fine for a…
Confirm before quoting: Solids content and particle size, chemistry and pH, the volume per batch, the discharge route and its local rules, drained weight for lifting, and the space…
/ Overview & Principle

HOW THIS BAG IS BUILT

The body is sewn from a woven geotextile rather than from coated PP. The fabric is chosen for its opening size and permeability, so water passes through the weave while the solid fraction is retained inside the bag. Lifting loops are sewn into the top seam and the base is closed flat, because the bag has to hold a wet load without leaking at the base.

The two decisions that set the bag are the fabric and the size. Fabric opening size follows the solids you need to keep in, and the bag size follows the volume of sludge and the number of bags the site can handle at once. A dewatering bag is a filter first and a container second.

Operational summary:

A woven bag made with geotextile fabric so water drains out while the solids stay in. It is sized from the sludge, the flow and the containment requirement rather than from a working load alone.

Dewatering FIBC — construction diagram, 720 x 520 px placeholder Recommended Size: 720 x 520 px
/ Features

KEY DESIGN ADVANTAGES.

Volume drops before haulage

Water leaves the bag on site, so the material that is finally moved and disposed of weighs and occupies far less.

Solids stay where they belong

Fabric opening size is matched to the solids so the retained fraction stays in the bag instead of running off.

Fits existing lifting equipment

Top loops let the bag be lifted by forklift or crane once it has drained, with no separate handling frame.

Works as a batch process

Bags are filled, left to drain and then removed one by one, which suits sites with limited lagoon or pad space.

Drainage confirmed on your own material

A trial bag filled with your sludge is the normal way to confirm drainage and retention before a full order, because both follow your solids and chemistry.

Runs on a prepared pad, no lagoon needed

Bags drain where they are laid, so a site without lagoon capacity can run the same process in batches and lift each bag away.

/ Construction & Performance

WHAT DECIDES THE SPECIFICATION.

5 points decide how this bag is specified. Use the arrows, the dots, or a swipe.

Dewatering FIBC — What it is for (960 x 640 px) 960 x 640 px
Positioning

What it is for

A woven bag made with geotextile fabric so water drains out while the solids stay in. It is sized from the sludge, the flow and the containment requirement rather than from a working load alone.

Dewatering FIBC — How it is built (960 x 640 px) 960 x 640 px
Construction

How it is built

The body is sewn from a woven geotextile rather than from coated PP. The fabric is chosen for its opening size and permeability, so water passes through the weave while the solid fraction is retained inside the bag. Lifting loops are sewn…

Dewatering FIBC — What you fix before weaving (960 x 640 px) 960 x 640 px
Configuration

What you fix before weaving

Bag size · Fabric · Filling · Lifting loops · Base · Seams · Drainage support

Dewatering FIBC — Its working envelope (960 x 640 px) 960 x 640 px
Performance

Its working envelope

Working range depends on the solids and the site: typical sludge projects use bags from about 2 m to 9 m circumference, filled in batches and left to drain for days or weeks. Retention and drainage figures are confirmed against a sample…

Dewatering FIBC — Where it is not the answer (960 x 640 px) 960 x 640 px
Limits

Where it is not the answer

Not a containment device for hazardous or regulated waste unless the whole system is designed for it: the bag drains, so anything dissolved in the water leaves with it, and local discharge rules remain the site's responsibility. Drainage also slows as the…

/ Configurations

CUSTOM CONFIGURATIONS & SIZING.

Bag size
Circumference 2-9 m, height 1-2 m (typical) Size is set from the sludge volume and the space available to lay bags out to drain.
Fabric
Woven geotextile, selected by opening size and permeability The opening size follows the solids you must retain.
Filling
Top fill port or open top A fill port keeps the bag closed while a pump discharges into it.
Lifting loops
Four corner loops, reinforced Loops are sized for the drained weight, not the wet weight.
Base
Closed flat base The base seam is the main leakage risk and is checked on each batch.
Seams
Double-row stitched Seam type is chosen so the fabric does not pull out under a wet load.
Drainage support
Used on a prepared pad or in a frame Drainage rate depends on how the bag is supported, which is the site's decision.
/ Applications

WHERE THIS FAMILY IS QUOTED.

Industrial Sludge Dewatering — 400 x 260 px placeholder 400 x 260 px

Industrial Sludge Dewatering

Dewatering industrial sludge and sediment in geotextile bags: water has to leave, solids have to stay, and the bag is sized by…

Dredging & Sediment Control — 400 x 260 px placeholder 400 x 260 px

Dredging & Sediment Control

Dredged spoil, channel sediment and lagoon or settlement-pond silt dewatered in filter bags: filled by pump or excavator, drained in batches on…

/ Performance

PERFORMANCE, TESTING & LIMITS.

1. Performance & working envelope

Rated rangeWorking range depends on the solids and the site: typical sludge projects use bags from about 2 m to 9 m circumference, filled in batches and left to drain for days or weeks. Retention and drainage figures are confirmed against a sample of your material rather than quoted from a table, because both depend on the solids and the chemistry.

2. How it is validated

TestingIn-house checks cover fabric weight, opening size against the agreed specification, seam stitch counts and bag dimensions. A trial bag filled with the customer's own material is the normal way to confirm drainage and retention before a full order. Third-party testing is arranged on request.

3. Limits

Where it is not the answerNot a containment device for hazardous or regulated waste unless the whole system is designed for it: the bag drains, so anything dissolved in the water leaves with it, and local discharge rules remain the site's responsibility. Drainage also slows as the cake builds up, so the process needs space and time rather than a single pass.

Selection & Purchasing Guidance

Best For:
Sludge, sediment and dredgings where the site needs to reduce water content before haulage or disposal and has space to drain bags in batches.
Consider Alternatives When:
The material must stay fully contained with no discharge, the site has no space for a drainage pad, or the solids are too fine for a woven fabric to retain without a treatment step.
Must Confirm Before Quoting:
Solids content and particle size, chemistry and pH, the volume per batch, the discharge route and its local rules, drained weight for lifting, and the space available.
/ On site

SEEN ON SITE.

Loading, lifting and standing full — the working conditions the specification is written for. Use the arrows, or drag the rail.

1 / 6

  • Dewatering FIBC on site — Filled at the bagging line 1000 x 625 px
    Filled at the bagging line
  • Dewatering FIBC on site — Handled under the base 1000 x 625 px
    Handled under the base
  • Dewatering FIBC on site — Lifted on the loops 1000 x 625 px
    Lifted on the loops
  • Dewatering FIBC on site — Standing full in a yard 1000 x 625 px
    Standing full in a yard
  • Dewatering FIBC on site — Base and seams after a load 1000 x 625 px
    Base and seams after a load
  • Dewatering FIBC on site — Baled and stacked in the warehouse 1000 x 625 px
    Baled and stacked in the warehouse
/ Factory direct B2B pricing

Ready to order?

Get a Quote

info@fibcpack.com WhatsApp +86 138 6426 5367