Application
Dredging & Sediment Control
Dredged spoil is not the same material twice. Sediment at the mouth of a channel is usually coarser than the silt in the middle of a settlement pond, and it changes again along the length of one dredge. What drains cleanly from one bag can sit wet in the next.
A filter bag takes the spoil where it comes out of the water, so the site handles dry weight instead of wet volume. The water leaves the fabric, the solids stay inside, and the reduced material is lifted away once it has drained.
The two decisions are the fabric opening size and the bag size. Opening size follows the sediment you have to keep in; bag size follows the volume per fill and the area you have on the bank to lay bags out. Tell us the sediment, the batch volume and where the drained water goes, and we will work from that.
Application Summary
Dredged spoil, channel sediment and lagoon or settlement-pond silt dewatered in filter bags: filled by pump or excavator, drained in batches on a prepared pad, and lifted out once drained.
Typical Customers & Materials
Dredging contractors, canal, marina and harbour operators, treatment works with settlement ponds, and environmental remediation firms. The buyer is normally a site or project engineer who has a dredge volume, a solids figure and a limited area on the bank to lay bags out.
Primary Job
Get the water out of the sediment where it is dredged, so the spoil is dry enough to lift, haul and dispose of, and the water can be returned or discharged under the site's own permit.
Operating Process
- Filling
- Lifting
- Storage & Transport
- Discharge
Operating Process Notes
Bags are laid out empty on a prepared pad, sometimes lined, and filled by pump from the dredge or by excavator from the bank. They drain on the pad for days or weeks, then are lifted out by plant and taken to a drying or disposal area. Bags are worked in batches: one group fills while another drains. Where the fill point has to be kept clear, bags can be filled in a frame and lifted out of it.
Key Risks
- Dewatering
- Leakage
- Overload
- Contamination
- UV Exposure
Key Risks - Additional Notes
Dewatering performance controls the job, and it depends on sediment that varies along the dredge, so a fabric that suits one stretch may blind on the next. Grit and shell fragments abrade the fabric as they are pumped in and again when the drained bag is dragged. The water that leaves the bag is not clean water: anything dissolved in the sediment leaves with it, so on contaminated dredgings the water has to be handled as the site's permit and waste classification require. The fill weight is unknown until the bag is full of water, so the pad, the frame and the lifting plan have to assume a heavy, wet, variable load. Bags that stand outside for weeks to months need UV-stabilised fabric.
Selection Notes
Start from the solids content and the particle size range, not from a bag size. Coarse sand and gravel drain quickly and suit a tighter fabric; silt and clay drain slowly and usually mean more bags at a smaller size, because the area available to drain on is the limiting factor and not the bag. Where the water returns to the channel or goes to treatment, agree the condition it has to meet before the bags are ordered, because that sets how fine the fabric can be. A trial bag filled with the actual dredgings is the normal way to confirm drainage and retention before an order.
Scope & Limitations
This page covers filter and dewatering bags for dredged spoil and for channel, lagoon and settlement-pond sediment. It does not design the dredge, the drainage pad or the discharge route, does not set discharge or consent limits, and does not replace the site's own permit, waste classification and water-quality duties. Drainage, retention and drained weight are confirmed per project against the customer's own material.
Recommended Products
Information Required
Dredging method and batch volume Required
Pump or excavator, the volume one bag takes per fill, and how often a bag is filled.
Solids content and particle size of the sediment Required
Percentage solids and whether the spoil is sandy, silty or clay-rich, which sets the fabric opening size.
Space available for bags Required
The area that can be given to bags and the surface they sit on, because draining takes area and time.
Where the drained water goes Required
Return to the channel, to a treatment plant, or to a discharge point under your permit, and the condition it has to meet.
Sediment chemistry and contamination status Required
pH and any known contamination, which affects the fabric choice and how the drained water has to be handled.
Lifting and removal plan
How the drained bag is lifted out and where it goes, since the bag leaves with its contents.